booth design and planning

By: pixalmate On: Wednesday, May 28, 2014
  • Share The Gag




  • From birth to the end of an exhibition, generally after the preparatory planning, design, construction, management and termination phases exhibited cleaning. Here to talk about the exhibition from the exhibitionfocuses on the design aspects of the design process and its requirement
    exhibition design and the overall design of the main points of local design The former focuses on macroeconomic effects, the latter focusing on the microscopic effects
      overall design (text outline) content through the system designer's overall planning, design series, the abstract concepts into concrete text under the overall theme of the show and exhibition planning program convey visual image of an innovative process, but also in the main exhibition design process. Themain aspects include the following aspects: 
      (1) Site Plan which includes planes, the transition of its facade and space requirements are different classifications exhibition space divided plane processing time .. specific to a session of the show, is in accordance with the implementation of the exhibition booth breeze distribution, venue planar division to determine the specific spatial extent, and then the physical density, weight, power load, such as a reasonable allocation of booth location and specific three-dimensional spatial scales. which should give full consideration to visit many routes, fire exits and the flow of visitors, planning a public space occupied area. General requirements for the exhibitionfacade effect, mainly grasp uniform height and color effects on the whole, in part by the general public a unified design, the requirements of each booth facade main emphasis uniform height, shape and color. other parts are locally designed to accomplish a booth from the effects of the overall space required to stand a reasonable distribution structure, spatial segmentation of naturalsmooth, vision changing, possession obvious benefits in the treatment of excess space, the main consideration coordination site building structures, natural light and artificial lighting between the audience and how to reduce visual fatigue, prevent harmful interference factors. above to In the planning and design, unified by the site proportions designed set of design renderings and construction production figure  (2) keynote handle the overall design of the tone, including shape the tone and color. tone, style and tone momentum tone. styling tone is generally divided into standard, special equipment, closed, open, etc., are also pressing display, exhibition, trade, interaction classification. traditional fashion from the style, animation, etc. . tone color tone can be divided into cold, warm and midtones. their requirements are different content, different seasons of color balance, tone environments, lighting effects, and macro-integrated light-colored, environment and natural color between color (or color Commission notes), respectively, the appropriate choice of color tone, and design related to the tone and color renderings chromatography. style tone, including the style of literary expression, the proportion of the amount of text, font selection, specification writing process, etc. It requires according to the different characteristics of the exhibition content and industry reports use different styles of type style, lyrical type, mission type, ad type, etc., and starting from the overall form, determined to show the whole graphic-based or in-kind, mainly in the font the selection, based primarily on custom content, nature, size, grade and application areas of literature, such as the International Exhibition common Chinese-English, Chinese language and ethnic minority areas selected text combined with other forms in the text specification should determine the choice of words were type (such as Arial, Helvetica, Times New Roman, advertising body, artistic, etc.) and size (uppercase or lowercase, Simplified or Traditional, etc.) and methods (straight books, computer lettering, printing, transfer printing, screen, projector, etc.). moving potential keynote main points dynamic, static and dynamic and static three keynote It is the organic unity of the whole show, the whole operation, coordinated and harmonious control lines. require rhythm control, rhythm and downs, giving a comfortable and flexible dynamic changes in the movement the potential occurrence of sense To prevent noise resonance in ensuring momentum on the basis of aesthetics, glare pollution, air pollution, fire bursts, groups congestion, as well as leakage, water leakage, air conditioning runaway insecurity
      (3) schedule. It includes investment booths, exhibits collection, display exhibit, supplies, transportation accommodation, public and coordination of several major schedule table.Due to complete a full course of the exhibition within the stipulated time and space. It requires time to be on the overall planning, science and logistics in order to achieve the desired optimal results. Merchants such as booths which must be fully implementedwithin a certain period of time. Another example exhibits positioning. It includes a fixed term, quantitative and qualitative analysis stage and given people, timing, location of the organization and the stage. Then press the preselection exhibits, registration implement organizational exhibits in place. After the exhibition in accordance with the clean-up of exhibits, unified register, reported archived. Show exhibit is one of the most tense before exhibitedworks, which include booth exhibits in place, exhibition facilities, decorated, exhibits adjustment, power installation and commissioning, staffing, data preparation. Conditions on the progress of the order of arrival of the exhibits according to available facilities and the quality of the power structures ofthe conditions are met, a reasonable time schedule, and leave room for flexibility.Supplies and traffic accommodation is above services can "horses came to pay military first", the whole schedule is an important part of the general schedule well in advance and reasonable dispatch, to strategizing, be prepared, must not (4) Materials program. It includes plans to primary materials and auxiliary materials, preparation, procurement implementation. Material requirements specifications, models, types and quantities consistent with the plan. Neither blindly purchase a backlog caused by waste, nor either left margin, now with the delay period are bought. Whether the plan is reasonable, balanced supply and demand in the pursuit of the whole exhibition design at a reasonable cost, the key to improving efficiency is also an important test of the exhibition designers. 
      (5) proposed budget. It is the economic lifeline of the entire show. Includingbooth breeze, exhibits transportation, exhibition design, labor production, venue rental, leasing exhibition making, power billing, security, and traffic accommodation advertising, press releases, other staff costs. It is based on the exhibition scale, design quality, construction conditions, management capability and the external environment are listed separately estimates. It is from the actual affordability of the entire exhibition starting the proposed program budget conscious, after repeated verification and balancing enacted. After senior audit report to the competent approval to enter the implementation of the operation. Financial management personnel in the actual operation of the process have to supervise the implementation of relevant and timely information feedback to the progress of high-level decision. In formulating the budget for general must leave room to prevent the occurrence of unpredictable factors. Exhibition
    Description: Exhibitor-Stall-knowledge,booth fabrication tips in Bangalore,exhibition knowledge ,fabrication tips in exhibition, booth fabricator india